Forums
ArchSociety :: Forum :: Design Process :: Jury, Presentation, Tools & Techniques |
|
« Previous topic | Next topic » |
swimming club and fitness center |
Moderator(s): Array, Array, Array, Array, Array, Array
|
Author | Post | ||
PORI |
|
||
Registered Member #128
Joined: Wed Aug 09 2006, 08:21am
: kuala lumpur Posts: 8 |
hi. every body...this is my b.sc. arch final year project. i mean 3.2 final project.. the project is swimming club and fitness center. i wish u guys will let me know my faults. byeeeeeeeeeeeee |
||
Back to top |
|
||
PORI |
|
||
Registered Member #128
Joined: Wed Aug 09 2006, 08:21am
: kuala lumpur Posts: 8 |
|
||
Back to top |
|
||
nirghum |
|
||
Registered Member #26
Joined: Mon Nov 28 2005, 05:52pm
: bits N bites Posts: 503 |
i cant review much technical but im amazed to see your creation. i loved them. | ||
Back to top |
|
||
NEO |
|
||
Registered Member #4
Joined: Thu Aug 04 2005, 04:54am
: Dhaka Posts: 666 |
It seems this one is a very interesting project. I would be glad to see the big pictures of your presentation sheets. But unfortunately they are not opening for some error in those images. Would you please write a bit more about your project and the concepts and about the site?... |
||
Back to top |
|
||
ASHRAF |
|
||
Registered Member #10
Joined: Thu Sep 01 2005, 09:20am
: Dhaka Posts: 49 |
This is a very interesting project. write more about your concept |
||
Back to top |
|
||
silent dark |
|
||
Registered Member #78
Joined: Tue Jul 18 2006, 05:42am
: Dhaka Posts: 49 |
please write more about your project | ||
Back to top |
|
||
PORI |
|
||
Registered Member #128
Joined: Wed Aug 09 2006, 08:21am
: kuala lumpur Posts: 8 |
HI..... THIS PROJECT WAS AN PROJECT TO SHOW URE STRENGTH IN CONTRUCTIONING SYSTEM AND IDEA TO STRUCTURAL DESIGN OF AN PUBLIC BUILDING. MY IDEA WAS TO SHOW THE STRUCTURAL ELEMENT AS A PART OF DESIGN ELEMENT. WHERE I VE TRIED TO ACHIVE AN AXIS OF THE BUILDING. THE AREA WAS TO HUGE. 7 ACRE. AN IT WAS IN THE CONTOUR OF THE SITE WAS FROM 5METRE TO 0 METRE. U GUYS CAN REFER THAT FRM THE SECTION. THE MAIN PART WAS THE SWIMMING CLUB AND THATS Y I VE TRIED TO GIVE IT MORE PRIORITY BY THE STRUCTURE OF THAT AREA.THE MATERIAL BEEN USED IF STEEL TRUSSES, GLASS FOR OPENINGS WHICH ARE FROM ROOF TO 1 METRE ABOVE FROM THE FLOOR. AND THE BASIC EXTERIOR WALLS ARE TERRACOTA BRICK. THIS AREA WILL BE USED BY 200 PEOPLE AT A TIME. THATS ALL FROM THE PROJECT. BYEEEEEE |
||
Back to top |
|
||
ASHRAF |
|
||
Registered Member #10
Joined: Thu Sep 01 2005, 09:20am
: Dhaka Posts: 49 |
very impressive presentation & idea | ||
Back to top |
|
||
Powered by e107 Forum System