Forums

ArchSociety :: Forum :: Campus - Event - Activities :: Plinth of Campuses
 
« Previous topic | Next topic »
High rise study BRAC University Architecture Dept. 3rd Yr 2nd Sem
 1 2 3 
Moderator(s): Array, Array, Array, Array, Array, Array
Author Post
Himel
Sun Mar 16 2008, 06:10pm
Registered Member #294 Joined: Mon Oct 16 2006, 05:10pm
: Dhaka
Posts: 310
ok.. I have to submitt parking, structure and service core report of an good foreign highrise building 18th March. Can you give me good links for that?
Back to top
NEO
Mon Mar 17 2008, 07:50am
Admin Registered Member #4 Joined: Thu Aug 04 2005, 04:54am
: Dhaka
Posts: 666
Himel wrote ...
ok.. I have to submitt parking, structure and service core report of an good foreign highrise building 18th March. Can you give me good links for that?
Why it has to be a foreign building? Yeh you can make good reports on structure from foreign buildings. But reporting on parking and service will be tough from books and internet.
Most of the books and websites just show off the dazzling beauty of structures of buildings. No one talks about parking or building services.
So I think it would better if you would work on any local building by famous architects that would help you more to learn about parking and building services.
Anyway, Norman Foster's HSBC Bank Headquarter in Hong Kong is one of the most successful highrises of this time. There's an article on this building in ArchSociety Library. Visit That.
Again... this article may only come to help for structure, not parking and services.
Back to top
Himel
Mon Mar 17 2008, 02:21pm
Registered Member #294 Joined: Mon Oct 16 2006, 05:10pm
: Dhaka
Posts: 310
I have to submit two reports. One for local and one for foreighn. I have got the local. And will now start searching the foreign. Thanks for the link
Back to top
aliza
Sun Mar 23 2008, 06:38pm
Registered Member #68 Joined: Thu Jul 06 2006, 06:28am
: dhaka
Posts: 162
can u send the jpegs of ur report so that i can read the report...
Back to top
Himel
Mon Mar 24 2008, 03:58am
Registered Member #294 Joined: Mon Oct 16 2006, 05:10pm
: Dhaka
Posts: 310
my? It was cancelled due to short time. We are now designing the building within about 20 days. April 18 is our semester's last day.
Back to top
anonna
Thu Dec 03 2009, 06:52pm
Registered Member #1748 Joined: Thu Dec 03 2009, 05:24pm
Posts: 3
hiiii........i'm 4m asia pacific,3.2...doing hirise...so,ashik vai,can u send me tha full size document where i can read them to understand those........ (:>)
Back to top
anonna
Thu Dec 03 2009, 06:58pm
Registered Member #1748 Joined: Thu Dec 03 2009, 05:24pm
Posts: 3
plssssss...if u can,send me d fuuly readable file that i can undersand ur effort............;>special.png
Back to top
anonna
Thu Dec 03 2009, 07:00pm
Registered Member #1748 Joined: Thu Dec 03 2009, 05:24pm
Posts: 3
hiiii........i'm 4m asia pacific,3.2...doing hirise...so,ashik vai,can u send me tha full size document where i can read them to understand those........ (:>)confused.png
Back to top
 1 2 3 

Go to:

Powered by e107 Forum System